Browse Source

chore: close N04 onboarding

backup/master-local-20261012
pwklppg 1 month ago
parent
commit
aa472cf90b
  1. 5
      changes/n04-onboard/.spec-superflow.yaml
  2. 1
      changes/n04-onboard/.superpowers/sdd/progress.md
  3. 6
      changes/n04-onboard/decision-point-audit.md

5
changes/n04-onboard/.spec-superflow.yaml

@ -1,5 +1,5 @@
version: 1
state: executing
state: closing
workflow: full
change_name: n04-onboard
artifact_language: zh-CN
@ -45,3 +45,6 @@ dp_6_timestamp: 2026-09-17T02:47:50Z
test_result: pass: scoped verification with formal waiver
spec_sync_result: manual publication passed: 12 requirements across 2 capabilities
spec_sync_timestamp: 2026-09-17T02:48:23Z
dp_7_result: confirmed: archive N04 and manually merge feat/n04-onboard to master
dp_7_timestamp: 2026-09-17T08:03:00Z
closed_at: 2026-09-17T08:03:00Z

1
changes/n04-onboard/.superpowers/sdd/progress.md

@ -23,3 +23,4 @@
- 2026-09-17T01:50:30Z W3 wave review PASS (conditional within N04): 96 tests, RR boundary 1, randomized E2E 7, OpenAPI 135 paths/9 operations; external blockers are existing full-suite failures and pending MySQL/Docker acceptance.
- 2026-09-17T02:47:50Z DP-6 pass with formal waiver: user accepted existing non-N04 full-suite failures; real MySQL/Docker remains a pre-release gate.
- 2026-09-17T02:48:23Z Spec merge completed manually: onboarding-checklist 6 requirements / 20 scenarios, company-knowledge 6 requirements / 16 scenarios; no conflicts.
- 2026-09-17T08:03:00Z DP-7 confirmed; state transitioned to closing; manual no-ff merge to master authorized.

6
changes/n04-onboard/decision-point-audit.md

@ -1,6 +1,6 @@
# N04 Decision Point Audit
审计时间:2026-09-17T01:53:38Z
审计时间:2026-09-17T08:03:00Z
## Decision Point Status
@ -13,7 +13,7 @@
| DP-4 | approved | SDD;W1/W2/W3 串行 wave 和依赖已固化 |
| DP-5 | not-triggered | T6/T8 各一次聚焦修复后复评通过,未达到三轮升级条件 |
| DP-6 | pass with formal waiver | N04 专项、OpenAPI、打包通过;既有非 N04 全量失败由用户正式豁免;真实 MySQL/Docker 保留为发布前门禁 |
| DP-7 | pending | 等待归档确认 |
| DP-7 | confirmed | 用户授权归档并手工合并 feat/n04-onboard 到 master |
## Contract Coverage
@ -21,7 +21,7 @@
- W2:学生有效清单与完成状态、企业清单 CRUD、公司知识配置与聚合,66 个 wave 测试通过。
- W3:权限、所有权、幂等、并发、端到端、隐私、OpenAPI 和文档,96 个 onboarding 回归通过。
- 12 条 MUST/SHALL 行为均有实现、测试和批次证据。
- 两份 delta specs 已准备好合并到根 specs/;尚未执行 merger。
- 两份 delta specs 已发布到根 specs/,共 12 条 Requirements,无冲突。
## Verification Evidence

Loading…
Cancel
Save